Client: Monte Carlo Limited
Scope of work: Initial pile load test, Lateral pile load test, and Dynamic test.
The initial pile load test was conducted with the crown method.
Copyrights © 2019 Goma Engineering & Consultancy. All Rights Reserved
Design By Barodaweb | The E-Catalouge Designer